• <rt id="amoky"><acronym id="amoky"></acronym></rt>
    <abbr id="amoky"><source id="amoky"></source></abbr>
  • <rt id="amoky"></rt>

    濟南誠耐金屬制品有限公司

    濟南誠耐金屬制品有限公司

    不斷發(fā)展技術(shù)力量、完善的設(shè)計服務(wù)團隊,真誠為您提供的服務(wù)

    咨詢熱線
    于經(jīng)理15194166167
    15990909037

    產(chǎn)品推薦

    聯(lián)系我們

    企業(yè)名稱:濟南誠耐金屬制品有限公司

    聯(lián)系人:于經(jīng)理

    電話: 15990909037

    電話: 15194166167

    地址:山東省濟南市歷城區(qū)小清河南路8288號

    當(dāng)前位置:首頁 »資訊中心 » 行業(yè)動態(tài)鋅鋼大理石電梯門套的施工方法

    鋅鋼大理石電梯門套的施工方法

    來源:http://m.k2f3.com/ 瀏覽:0發(fā)表時間:2022-03-10
    (1)鋅鋼大理石電梯門套廠家的石材選擇:用比色法對石材的顏色進行選擇分類,裝置在同一面的石材顏色應(yīng)共同,按規(guī)劃圖紙及分塊次序?qū)⑹木幪枴?
    (1) Stone selection of zinc steel marble elevator door pocket manufacturer: the color of stone shall be selected and classified by colorimetry. The color of stone installed on the same side shall be the same, and the stone shall be numbered according to the planning drawings and block order.
    (2)墻面底層整理:整理墻面,裝好底層托架。,同時進行結(jié)構(gòu)套方,找規(guī)則,彈出筆直線和水平線。并根據(jù)規(guī)劃圖紙和實際需要彈出裝置石材的位置線和分塊線。
    (2) Wall bottom finishing: tidy the wall and install the bottom bracket., At the same time, set the square of the structure, find the rules, and pop up the pen straight line and horizontal line. According to the planning drawings and actual needs, the position line and block line of the device stone shall be popped out.
    (3)打線:根據(jù)尺度,打好施工線,石材裝置前要事先用經(jīng)緯儀沖擊大角兩個面的豎向控制線,彈在離大角500px 的位置上,以便隨時檢查筆直掛線的線,確保順暢裝置,并在控制線的上下作出標(biāo)記。
    (3) Setting out: according to the scale, set up the construction line. Before the stone device, impact the vertical control line on both sides of the big corner with a theodolite and snap it at the position 500px away from the big corner, so as to check the straight line at any time, ensure the smooth device, and mark the upper and lower parts of the control line.
    電梯門套線
    (4)鋅鋼大理石電梯門套廠家的裝置底層托架,把預(yù)先安排好的支托按上平線支在將要裝置的底層石板上面。支托要支承結(jié)實,相互之間要銜接好,也可和架子接在一同,支架安好后,順支托方向釘鋪通長的50mm 厚木板,木板上口要在同一個水平面上,以確保石材上下面處在同一水平面上。
    (4) The bottom bracket of the device of the manufacturer of zinc steel marble elevator door pocket supports the pre arranged support on the bottom slab to be installed according to the upper flat line. The support shall be firmly supported, well connected with each other, or connected with the frame. After the support is installed, a full-length 50mm thick wood plate shall be nailed along the support direction, and the upper opening of the wood plate shall be on the same horizontal plane to ensure that the upper and lower parts of the stone are on the same horizontal plane.
    (5)裝置銜接構(gòu)件:用規(guī)劃規(guī)則的不銹鋼螺栓固定角鋼和平鋼板。調(diào)整平鋼板的位置,使平鋼板的小孔正好與石板的刺進孔對上,固定平鋼板,用扳子擰緊。
    (5) Connecting components of the device: fix angle steel and flat steel plate with stainless steel bolts of planning rules. Adjust the position of the flat steel plate so that the small hole of the flat steel plate is just opposite to the puncture hole of the stone plate, fix the flat steel plate and tighten it with a wrench.
    (6)大理石裝修板材裝置:依照溝槽和構(gòu)件找好位置,便可把底層面板靠角上的一塊就位。
    (6) Marble decoration plate device: find the position according to the groove and components, and then put a piece on the corner of the bottom panel in place.
    (7)板面微調(diào):裝置好大理石裝修板材再調(diào)整水平度,如板面上口不平, 可在板底的一端下口的銜接平鋼板上墊一相應(yīng)的雙股銅絲墊。調(diào)整筆直度,并調(diào)整面板上口的不銹鋼銜接件的距墻空地,直至面板筆直。
    (7) Fine adjustment of board surface: after the marble decoration board is installed, adjust the levelness. If the upper opening of the board surface is uneven, a corresponding double strand copper wire pad can be padded on the connecting flat steel plate at the lower opening of one end of the board bottom. Adjust the straightness, and adjust the space between the stainless steel connector at the upper opening of the panel and the wall until the panel is straight.
    (8)頂部裝修板材的裝置:頂部一層面板除了按一般石板裝置要求外,裝置調(diào)整好,在結(jié)構(gòu)與石板的縫隙里吊一通長的20mm 厚木條,木條上平為石板上口下去250mm,吊點可設(shè)在銜接鐵件上。可用彩鋁絲吊木條,木條吊好后,即在石板與墻面之間的空地里放填充物,且填塞嚴(yán)實,防止灌漿時漏漿。
    (8) Top decoration plate device: in addition to the requirements of general slate device, the device of the top layer of panel shall be adjusted well. A full-length 20mm thick wooden strip shall be hung in the gap between the structure and the slate. The upper plane of the wooden strip is 250mm below the upper mouth of the slate, and the lifting point can be set on the connecting iron parts. The colored aluminum wire can be used to hang the wooden strip. After the wooden strip is hoisted, fill the space between the stone slab and the wall tightly to prevent slurry leakage during grouting.
    (9)整理大理石外表:把大理石外表的防污條掀掉,用棉絲把石板擦凈。
    (9) Finishing the marble surface: remove the anti fouling strip on the marble surface and wipe the slate with cotton yarn.
    久久超乳爆乳中文字幕| 99久久精品费精品国产一区二区| 久久久久久久久久久福利| 久久se精品一区二区影院| 国产精品一区二区久久精品涩爱| 久久久精品2019中文字幕之3| 久久久久亚洲av毛片大| 国产美女久久久久| 精品一久久香蕉国产二月| 无码专区久久综合久中文字幕| 东方aⅴ免费观看久久av| 一本色道久久88综合日韩精品| av无码久久久久久不卡网站 | 久久人人爽人人爽av片| 久久精品夜夜夜夜夜久久| 久久九九久精品国产日韩经典| 久久久受www免费人成| 内射无码专区久久亚洲| 亚洲午夜精品久久久久久app| 久久人妻AV中文字幕| 久久丫精品国产亚洲av不卡| 亚洲成色www久久网站夜月| 思思久久精品在热线热| 久久久久久国产a免费观看不卡| 国产69精品久久久久妇女| 麻豆网神马久久人鬼片| 中文字幕久久波多野结衣av不卡| 97色伦图片7778久久| 久久精品无码午夜福利理论片| 久久久精品免费视频| 久久久精品2019中文字幕之3| 久久综合久久综合九色| 久久精品国产99国产精偷| 国产午夜电影久久| 伊人久久大香线蕉免费视频 | 久久久久成人精品一区二区| 精品国产福利久久久| 久久99中文字幕久久| 人人狠狠综合久久亚洲婷婷| 亚洲国产精品无码久久SM| 久久天天躁夜夜躁狠狠躁2015 |