• <rt id="amoky"><acronym id="amoky"></acronym></rt>
    <abbr id="amoky"><source id="amoky"></source></abbr>
  • <rt id="amoky"></rt>

    濟南誠耐金屬制品有限公司

    濟南誠耐金屬制品有限公司

    不斷發展技術力量、完善的設計服務團隊,真誠為您提供的服務

    咨詢熱線
    于經理15194166167
    15990909037

    聯系我們

    企業名稱:濟南誠耐金屬制品有限公司

    聯系人:于經理

    電話: 15990909037

    電話: 15194166167

    地址:山東省濟南市歷城區小清河南路8288號

    當前位置:首頁 »資訊中心 » 行業動態電梯門套安裝門套窗套工藝特點

    電梯門套安裝門套窗套工藝特點

    來源:http://m.k2f3.com/ 瀏覽:0發表時間:2023-12-13

    一、電梯套、門套、窗套安裝前期工作:

    1、 Pre installation work for elevator covers, door covers, and window covers:

    安裝電梯套和門窗套前,應先檢驗預留門窗洞口的尺寸是否符合設計要求以及前道工序質量是否能滿足安裝要求。墻面的基底是否符合作業條件,并應在墻頂、墻面及地面抹灰工程完工后進行。

    Before installing elevator sleeves and door and window sleeves, it is necessary to check whether the size of the reserved door and window openings meets the design requirements and whether the quality of the previous process can meet the installation requirements. Whether the base of the wall meets the working conditions should be carried out after the completion of the wall top, wall, and floor plastering works.

    二、電梯套、門窗套施工安裝流程:

    2、 Construction and installation process of elevator sleeves and door and window sleeves:

    1、電梯門套施工流程 :檢查安裝墻面、套口——定位與放線——檢查石塑線條和搭配側板——結構膠涂點——安裝固定——清潔飾面

    1. Elevator door frame construction process: Check and install the wall and sleeve opening - Positioning and laying out - Check the stone plastic lines and matching side panels - Apply structural adhesive points - Install and fix - Clean the surface

    2、檢查安裝墻面、套口:檢查墻面和套口的安裝前提是否具備,檢查門套預留洞口尺寸是否符合設計要求,窗套檢查預留臺面是否符合尺寸。

    2. Check the installation of walls and openings: Check if the installation prerequisites for the walls and openings are met, check if the size of the reserved opening for the door frame meets the design requirements, and check if the reserved countertop for the window frame meets the size.

    20210219015751941.jpg

    3、定位放線:根據設計要求,在實際位置做出基礎線,并保證整體方正。門套定位,壓框寬度應保證余量尺寸一致。

    3. Positioning and laying out: According to the design requirements, make the foundation line at the actual position and ensure the overall squareness. The positioning of the door frame and the width of the pressure frame should ensure consistent margin dimensions.

    4、檢驗石塑線條和側板:安裝前,檢查石塑線條和側板的尺寸、規格、加工質量、特備零件的規格以及數量**符合設計及規范要求。

    4. Inspection of stone plastic lines and side panels: Before installation, check that the size, specifications, processing quality, specifications, and quantity of special parts of the stone plastic lines and side panels meet the design and specification requirements.

    5、結構膠涂點:在電梯套和門窗套所需的石塑線條和側板背部進行結構膠均勻打點,間距為10-20CM為宜。

    5. Structural adhesive application points: Apply structural adhesive evenly on the stone plastic lines and back of the side panels required for elevator sleeves and door and window sleeves, with a spacing of 10-20CM.

    6、安裝固定:電梯套和門套安裝需對安裝部位首先量尺,處理接頭及轉角位置;設計無特殊要求,接頭應成45°角;然后直接按照施工圖要求進行上墻安裝。

    6. Installation and fixation: For the installation of elevator sleeves and door sleeves, the installation site needs to be measured first, and the joint and corner positions should be processed; There are no special requirements for the design, and the joint should be at a 45 ° angle; Then proceed with wall installation directly according to the construction drawings.

    7、清潔飾面:安裝完工之后撕去飾面的保護膜,用抹布和肥皂水對勾縫出進行清潔處理。

    7. Cleaning the finish: After installation is completed, remove the protective film from the finish and clean the joints with a cloth and soapy water.

    三、電梯套、門套、窗套安裝質量主控項目:

    3、 Main quality control items for the installation of elevator covers, door covers, and window covers:

    1、電梯套、門窗套制作安裝所使用材料的材質、規格、花紋和顏色、材質的防火性、膠粘劑的甲醛含量應符合設計要求及***標準的有關規定。

    1. The materials, specifications, patterns, and colors used for the production and installation of elevator sleeves and door and window sleeves, as well as the fire resistance of the materials and the formaldehyde content of the adhesive, should comply with the design requirements and relevant regulations of * * * standards.

    2、石塑電梯門套的造型、尺寸和固定方法應符合設計要求,安裝應牢固。

    2. The shape, size, and fixing method of the stone plastic elevator door frame should meet the design requirements, and the installation should be firm.

    3、電梯套和門套表面應平整、潔凈、線條順直、接縫嚴密、色澤一致,不得有裂縫、翹曲及損壞。

    3. The surface of elevator and door covers should be flat, clean, with straight lines, tight joints, and consistent color, without cracks, warping, or damage.

    四、電梯套、門套成品保護:

    4、 Protection of finished elevator and door frames:

    安裝電梯門套時不得損壞墻面,不得用錘擊墻面和門窗框。應注意保護已施工完的墻面、地面、頂棚和窗臺不受損壞,保持裝飾面層的潔凈。

    When installing elevator door frames, do not damage the walls, and do not use hammers to hit the walls and door and window frames. Attention should be paid to protecting the completed walls, floors, ceilings, and window sills from damage, and maintaining the cleanliness of the decorative surface layer.

    精品av天堂毛片久久久| 一级做a爱片久久毛片| 久久久久人妻精品一区三寸| 久久精品动漫一区二区三区| 色婷婷噜噜久久国产精品12p| 色婷婷综合久久久久中文| 久久精品这里只有精99品| 久久99这里只有精品国产| 久久99国产亚洲精品观看| 久久久久无码国产精品不卡| 69久久精品无码一区二区| 久久免费看少妇高潮V片特黄| 国产精品熟女福利久久AV| 久久桃花综合桃花七七网| 97色伦图片7778久久| 久久精品私人影院免费看| 波多野结衣中文字幕久久| 国产综合久久久久久| 国产精品中文久久久久久久 | 99久久精品费精品国产一区二区 | 久久这里只有精品首页| 久久久精品久久久久久| 精品中文字幕久久久久久| 色综合久久中文色婷婷| 久久精品国产网红主播| 久久丫精品久久丫| 久久精品电影免费动漫| 国产一级做a爰片久久毛片| 久久精品无码一区二区app| 狠狠综合久久久久综合网| 亚洲精品久久无码| 狠狠色丁香婷婷久久综合五月| 99久久久久久久| 色欲综合久久躁天天躁蜜桃| 久久人人爽人人爽大片aw | 精品一区二区久久久久久久网精| 97久久超碰国产精品旧版| 国产成人精品久久免费动漫| 久久久久久精品免费看SSS| 91精品国产色综合久久不卡蜜| 久久久久人妻一区精品性色av|