• <rt id="amoky"><acronym id="amoky"></acronym></rt>
    <abbr id="amoky"><source id="amoky"></source></abbr>
  • <rt id="amoky"></rt>

    濟南誠耐金屬制品有限公司

    濟南誠耐金屬制品有限公司

    不斷發(fā)展技術(shù)力量、完善的設(shè)計服務(wù)團(tuán)隊,真誠為您提供的服務(wù)

    咨詢熱線
    于經(jīng)理15194166167
    15990909037

    產(chǎn)品推薦

    聯(lián)系我們

    企業(yè)名稱:濟南誠耐金屬制品有限公司

    聯(lián)系人:于經(jīng)理

    電話: 15990909037

    電話: 15194166167

    地址:山東省濟南市歷城區(qū)小清河南路8288號

    當(dāng)前位置:首頁 »資訊中心 » 新聞資訊電梯門套工程安裝質(zhì)量要求

    電梯門套工程安裝質(zhì)量要求

    來源:http://m.k2f3.com/ 瀏覽:0發(fā)表時間:2022-07-11
    1.為了保證企業(yè)的品牌,保證業(yè)主較高質(zhì)量要求,乙方在進(jìn)場后要認(rèn)真配合現(xiàn)場核對好尺寸,確認(rèn)好圖紙以便生產(chǎn),對進(jìn)場的成品材料要有程序的去安裝,小心堆放,如因乙方亂堆放造成板材破損,一切損失由乙方負(fù)責(zé)。
    1. In order to ensure the brand of the enterprise and the high quality requirements of the owner, Party B should carefully cooperate with the site to check the size and confirm the drawings for production after entering the site. The finished materials entering the site should be installed in a programmed way and stacked carefully. If the plates are damaged due to Party B's random stacking, Party B should be responsible for all losses.
    2.在安裝時要按照圖紙(有編號的板材按編號安裝),特殊需要調(diào)整的板面由現(xiàn)場安裝人員自行調(diào)整后再安裝,對不能上墻的板面不要安裝,及時通知工廠再補。
    2. During installation, the plates shall be installed according to the drawings (numbered plates shall be installed according to the number). The plates that need special adjustment shall be installed after being adjusted by the on-site installation personnel. The plates that cannot be installed on the wall shall not be installed, and the factory shall be notified in time to make up.
    3.安裝時每個墻面的陽角、橫豎縫、板面缺角、崩邊等要修補的石材,由安裝工自己在施工中及時修補好再安裝。每個墻面完工后,由現(xiàn)場主管檢查驗收后,交項目部驗收打包(屬于加工錯誤,現(xiàn)場不能修補的由工廠派人員修理)。
    3. During installation, the stone materials to be repaired, such as external corners, horizontal and vertical joints, missing corners and broken edges of each wall surface, shall be repaired by the installer himself in time during construction before installation. After the completion of each wall, the on-site supervisor shall check and accept it, and then submit it to the project department for acceptance and packaging (if it is a processing error and cannot be repaired on site, the factory shall send professionals to repair it).
    4.成品材料到場后,要按照圖紙對照好墻面進(jìn)行安裝,對因安裝質(zhì)量不合格,圖紙尺寸于墻面不吻合引起返工,重新補板,造成材料損失,一切責(zé)任由乙方承擔(dān)(屬于工廠切割錯誤的報到工廠做調(diào)換)。
    4. After the finished materials arrive at the site, the wall shall be installed according to the drawings. Party B shall bear all the responsibilities for the rework caused by the unqualified installation quality and the inconsistent size of the drawings with the wall, and the material loss caused by the re patching of the plates (if the cutting is wrong in the factory, report to the factory for replacement).
    以上就是為大家介紹的有關(guān)電梯不銹鋼門套的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.k2f3.com
    The above is a detailed introduction about the stainless steel door pocket of elevator. I hope it can help you If you have any questions, please contact us We will provide you with professional service http://m.k2f3.com
    久久精品国产一区二区电影| 香蕉久久丫精品忘忧草产品| 久久国产视频99电影| 国产精品久久久久9999| 久久精品国产清白在天天线| 国产一区二区三区精品久久呦| 亚洲欧洲国产精品久久| 久久精品国产自在一线| 久久久久国产一级毛片高清板| 亚洲精品乱码久久久久久蜜桃图片 | 久久se精品一区精品二区| 色婷婷久久久SWAG精品| 一本久道久久综合狠狠躁| 久久亚洲精品人成综合网| 亚洲国产精品无码久久久秋霞2 | 久久99热只有频精品8| 久久国产精品国产自线拍免费| 久久AAAA片一区二区| 色综合久久天天综线观看| 一本天堂ⅴ无码亚洲道久久| 亚洲精品成人久久| 久久亚洲美女精品国产精品| 久久本网站受美利坚法律保护| 伊人色综合久久天天人手人婷| 久久久久成人精品无码| 国产成人无码精品久久久久免费| 精品伊人久久久久网站| 久久艳务乳肉豪妇荡乳a片| 97久久精品无码一区二区天美| 久久久久久曰本AV免费免费| 久久久久亚洲av无码专区喷水| 久久aⅴ免费观看| 一本大道久久a久久精品综合| 久久久久久久久久久久久久久久久久| 亚洲国产精品无码久久久秋霞2 | 久久婷婷国产剧情内射白浆| 日本久久久久亚洲中字幕| 亚洲国产精品久久久久婷婷软件| 久久99精品久久久久久久野外| 久久久久久久久久久福利| 麻豆一区二区99久久久久|