• <rt id="amoky"><acronym id="amoky"></acronym></rt>
    <abbr id="amoky"><source id="amoky"></source></abbr>
  • <rt id="amoky"></rt>

    濟南誠耐金屬制品有限公司

    濟南誠耐金屬制品有限公司

    不斷發(fā)展技術(shù)力量、完善的設(shè)計服務(wù)團(tuán)隊,真誠為您提供的服務(wù)

    咨詢熱線
    于經(jīng)理15194166167
    15990909037

    產(chǎn)品推薦

    聯(lián)系我們

    企業(yè)名稱:濟南誠耐金屬制品有限公司

    聯(lián)系人:于經(jīng)理

    電話: 15990909037

    電話: 15194166167

    地址:山東省濟南市歷城區(qū)小清河南路8288號

    當(dāng)前位置:首頁 »資訊中心 » 新聞資訊電梯門套工程安裝質(zhì)量要求

    電梯門套工程安裝質(zhì)量要求

    來源:http://m.k2f3.com/ 瀏覽:0發(fā)表時間:2022-07-11
    1.為了保證企業(yè)的品牌,保證業(yè)主較高質(zhì)量要求,乙方在進(jìn)場后要認(rèn)真配合現(xiàn)場核對好尺寸,確認(rèn)好圖紙以便生產(chǎn),對進(jìn)場的成品材料要有程序的去安裝,小心堆放,如因乙方亂堆放造成板材破損,一切損失由乙方負(fù)責(zé)。
    1. In order to ensure the brand of the enterprise and the high quality requirements of the owner, Party B should carefully cooperate with the site to check the size and confirm the drawings for production after entering the site. The finished materials entering the site should be installed in a programmed way and stacked carefully. If the plates are damaged due to Party B's random stacking, Party B should be responsible for all losses.
    2.在安裝時要按照圖紙(有編號的板材按編號安裝),特殊需要調(diào)整的板面由現(xiàn)場安裝人員自行調(diào)整后再安裝,對不能上墻的板面不要安裝,及時通知工廠再補。
    2. During installation, the plates shall be installed according to the drawings (numbered plates shall be installed according to the number). The plates that need special adjustment shall be installed after being adjusted by the on-site installation personnel. The plates that cannot be installed on the wall shall not be installed, and the factory shall be notified in time to make up.
    3.安裝時每個墻面的陽角、橫豎縫、板面缺角、崩邊等要修補的石材,由安裝工自己在施工中及時修補好再安裝。每個墻面完工后,由現(xiàn)場主管檢查驗收后,交項目部驗收打包(屬于加工錯誤,現(xiàn)場不能修補的由工廠派人員修理)。
    3. During installation, the stone materials to be repaired, such as external corners, horizontal and vertical joints, missing corners and broken edges of each wall surface, shall be repaired by the installer himself in time during construction before installation. After the completion of each wall, the on-site supervisor shall check and accept it, and then submit it to the project department for acceptance and packaging (if it is a processing error and cannot be repaired on site, the factory shall send professionals to repair it).
    4.成品材料到場后,要按照圖紙對照好墻面進(jìn)行安裝,對因安裝質(zhì)量不合格,圖紙尺寸于墻面不吻合引起返工,重新補板,造成材料損失,一切責(zé)任由乙方承擔(dān)(屬于工廠切割錯誤的報到工廠做調(diào)換)。
    4. After the finished materials arrive at the site, the wall shall be installed according to the drawings. Party B shall bear all the responsibilities for the rework caused by the unqualified installation quality and the inconsistent size of the drawings with the wall, and the material loss caused by the re patching of the plates (if the cutting is wrong in the factory, report to the factory for replacement).
    以上就是為大家介紹的有關(guān)電梯不銹鋼門套的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.k2f3.com
    The above is a detailed introduction about the stainless steel door pocket of elevator. I hope it can help you If you have any questions, please contact us We will provide you with professional service http://m.k2f3.com
    日日狠狠久久偷偷色综合0| 色综合久久中文色婷婷| 久久久久人妻一区精品| 久久国产AVJUST麻豆| 久久99精品久久久久久综合| 国内精品久久久久久不卡影院| 色天天综合久久久久综合片| 91精品国产91久久久久| 久久精品视频一区二区三区| 精品久久久久中文字| 色综合久久天天综合绕观看| 久久久久国产精品熟女影院| 久久精品美女视频| 国产一区二区三区久久| 久久精品国产只有精品66| 手机看片久久国产免费| 久久99热这里只频精品6| 久久国产免费观看精品3| 久久久这里有精品999| 国产高潮国产高潮久久久| 中文字幕伊人久久网| 国产精品嫩草影院久久| 亚洲精品97久久中文字幕无码| 精品香蕉久久久午夜福利| 伊人久久大香线蕉综合网站| 久久久久精品国产亚洲AV无码| 伊人久久大香线蕉精品| 久久亚洲一区二区| 久久国产一区二区三区| 久久国产精品2020盗摄| 久久国产劲暴∨内射新川| 久久午夜无码免费| 久久夜色精品国产噜噜| 久久国产精品免费观看| 久久午夜精品视频| 午夜精品久久久久久久| 婷婷久久香蕉五月综合加勒比| 久久一区二区三区免费播放| 色欲久久久天天天综合网| 91精品久久久久久久久中文字幕| 久久久久亚洲精品天堂|